Problems at industry that need to be solved:

 

1. Traditional VOC abatement economic models typically represent an unrecoverable life-cycle

    cost

2. Electricity generated at large central power plants are typically 30% efficient at point of use

    because:

       a. Heat generated is not beneficially utilized

       b. Electric power line losses during transmission and distribution

3. Electric power availability is subject to variable weather, contract, demand and unplanned

    events

4. Change in electric power use rates and time(s), can change power prices and rates

5. Changes in power and fuel prices due to market fluctuations

I.  Problem Statement